- Posts: 19
- Thank you received: 0
Z Scale Turnout Numbers
- CNz220
- Offline
- New Member
Please Log in or Create an account to join the conversation.
- ztrack
- Offline
- Dispatcher
- Posts: 855
- Thank you received: 192
Rob
Please Log in or Create an account to join the conversation.
- TailUK
- Offline
- New Member
- Posts: 86
- Thank you received: 2
Had a little trouble with 1 or 2 of the PCB ties which can de-laminate if you get them to hot but not bad.
Please Log in or Create an account to join the conversation.
- CNz220
- Offline
- New Member
- Posts: 19
- Thank you received: 0
Please Log in or Create an account to join the conversation.
- TailUK
- Offline
- New Member
- Posts: 86
- Thank you received: 2
My money would be on Fast Track to be more "in scale" than any set track so unless your going to go completely hand built you may have to accept a little compromise in the track laying. It may mean you'll have a little "bodging" to do where the set curves connect to the turnouts to maintain the geometery.
Please Log in or Create an account to join the conversation.
- CNz220
- Offline
- New Member
- Posts: 19
- Thank you received: 0
Please Log in or Create an account to join the conversation.
- loadmaster
- Offline
- Senior Member
- Posts: 245
- Thank you received: 1
Robert
Please Log in or Create an account to join the conversation.
- craZ13
- Offline
- Senior Member
- Posts: 277
- Thank you received: 3
www.ztrains.com/basics/mix/mix.html
Jerry
Please Log in or Create an account to join the conversation.
- TailUK
- Offline
- New Member
- Posts: 86
- Thank you received: 2
On Z Trains, the last Z Basics article discussed mixing track brands and the height issue. Here is the link:
www.ztrains.com/basics/mix/mix.html
Jerry
Looks good. What code is MTL flexi-track?
The fast Track turnouts would be even easier to shim up as the difference between code 55 Fast Track and the code 60 Peco rail is only a fraction of a millimetre.
The weird tie spacing is more of a problem. I had a go at cutting my own Quick Stick turnout ties on the laser cutter with some sucess perhaps I could cut some using similar tie spacing to Peco track.
Please Log in or Create an account to join the conversation.
- CNz220
- Offline
- New Member
- Posts: 19
- Thank you received: 0
Please Log in or Create an account to join the conversation.
- TailUK
- Offline
- New Member
- Posts: 86
- Thank you received: 2
MTL flex is code 55.
So the only difference might be the thickness of the ties. This can rectified with card stock shims.
Please Log in or Create an account to join the conversation.
- David K. Smith
- Offline
- Premium Member
- Posts: 446
- Thank you received: 40
cnz4956 wrote:
MTL flex is code 55.
So the only difference might be the thickness of the ties. This can rectified with card stock shims.
I'd recommend styrene. Cardstock will create problems when ballasting.
Please Log in or Create an account to join the conversation.
- GWoodle
- Offline
- New Member
- Posts: 36
- Thank you received: 0
The Walthers roadbed comes in 3mm & 5mm thickness. something may be useable there?
also, Midwest Products makes foam sheets with 3mm, 5mm, 10 mm thickness. It may be possible to cut a sheet to fit your needs? Could also be a way to shim buildings if you need to match a door with a platform?
Please Log in or Create an account to join the conversation.